PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Main Sprinkler piping at the 1st Floor Facing North-East (800x600).jpg Metal Track (800x600).jpg Poured slab on deck at half of the 4th Floor Facing North-West (800x600).jpg Pouring concrete at half of the 4th Floor Facing North-West (800x600).jpg Welding beam clips at the 3rd Floor Facing East (800x600).jpg
Previous page Welding beam clips at the 3rd Floor Facing East (800x600)
Welding beam clips at the 3rd Floor Facing East (800x600)